Saturday, October 6, 2012

K Class all dressed up and getting ready to go.




The K class sample which was test run at the Caulfield exhibition has now been checked and given a coat of paint.
It has also under-gone further extensive running and the factory has been advised of a couple of minor changes required. Sound files are being collected now so that when the final engineering sample which incorporates all corrections is available the sound installation process can be carried out by QSI. The sound has to be synchronised to the running characteristics of the motor and this can only be done once the final running sample is available.
The whole process is proceeding ahead of time at the moment and is on target for delivery in the second half of 2013 around Caulfield exhibition time.

No comments: