NON-SOUND CPH/CTH ON THE WATER
Word from the factory is that the production run of the non-sound CPH/CTH is finished and is booked on a ship leaving Shenzhen on the 1st of March.
Ron
Thursday, February 26, 2009
Monday, February 16, 2009
38 Class Paint Samples
Last seven painted 38 class bodies have arrived and we now have received all 13 paint schemes. These are being checked and when we have confirmed the 13 liveries painting of the bodies will commence. Assembly will commence when the painting stage is finished.
Photos will be up on the web-site shortly.
,
Last seven painted 38 class bodies have arrived and we now have received all 13 paint schemes. These are being checked and when we have confirmed the 13 liveries painting of the bodies will commence. Assembly will commence when the painting stage is finished.
Photos will be up on the web-site shortly.
,
Friday, February 13, 2009
Monday, January 26, 2009
LCH/CCH Stock Update
At the current rate of sales it is estimated that stocks of LCH and CCH 4 wheel hoppers will last about six months. However, stocks of pack No 3 (LCHs) and pack No 4 (CCHs) are now both down to less than 20 packs. Packs 3 and 4 are back-up packs that provide different sets of numbers for those who wish to run more than 10 of either the LCHs or CCHs. It appears that we have under-estimated the demand for these packs and they will be the first to sell out completely.
Anyone intending to purchase adittional packs are advised to do so quickly if different numbered wagons are important
At the current rate of sales it is estimated that stocks of LCH and CCH 4 wheel hoppers will last about six months. However, stocks of pack No 3 (LCHs) and pack No 4 (CCHs) are now both down to less than 20 packs. Packs 3 and 4 are back-up packs that provide different sets of numbers for those who wish to run more than 10 of either the LCHs or CCHs. It appears that we have under-estimated the demand for these packs and they will be the first to sell out completely.
Anyone intending to purchase adittional packs are advised to do so quickly if different numbered wagons are important
Saturday, January 17, 2009
38 Class Update
Whilst at the factory I saw painted body samples for all liveries of the 38 class. They looked superb. I couldn't bring them back with me so the factory has put them on Fedex and I have received advice that they will be delivered Monday.
We will check the liveries and assuming they are correct forward our approval to the factory so that when the factory resumes production after Chinese New Year painting and then assembly can commence. This would suggest a delivery date sometime in March or April.
I will put photographs on the web-site as soon as they can be arranged.
Whilst at the factory I saw painted body samples for all liveries of the 38 class. They looked superb. I couldn't bring them back with me so the factory has put them on Fedex and I have received advice that they will be delivered Monday.
We will check the liveries and assuming they are correct forward our approval to the factory so that when the factory resumes production after Chinese New Year painting and then assembly can commence. This would suggest a delivery date sometime in March or April.
I will put photographs on the web-site as soon as they can be arranged.
Friday, January 16, 2009
A Most Succesful Factory Visit
Arrived back in Sydney yesterday (Thursday) and just getting over the jet lag. This was a very succesful (and enjoyable) visit. I have started work on the next edition of The Eureka Times which should be ready for distribution next week.
I will also be posting snippets of information here as I think of stuff.
As a matter of interest and an indication of snippets to come the following is the agenda for the two meetings held at the factory. (The main meeting was at the Design Department followed by a second meeting in the Drawing Department for more detailed discussions on projects at the drawing stage.)
1. CPH/CTH
2. 38 class
3. 40 class
4. R class
5. 59 class
6. AD60 re-run
7. HUB car set
8. DEB set
9. 620/720 re-run
10. K class
11. RSH
12 BCW and BSV
13. Oil tankers
14. 30 class tank engine
15. 43 class
Arrived back in Sydney yesterday (Thursday) and just getting over the jet lag. This was a very succesful (and enjoyable) visit. I have started work on the next edition of The Eureka Times which should be ready for distribution next week.
I will also be posting snippets of information here as I think of stuff.
As a matter of interest and an indication of snippets to come the following is the agenda for the two meetings held at the factory. (The main meeting was at the Design Department followed by a second meeting in the Drawing Department for more detailed discussions on projects at the drawing stage.)
1. CPH/CTH
2. 38 class
3. 40 class
4. R class
5. 59 class
6. AD60 re-run
7. HUB car set
8. DEB set
9. 620/720 re-run
10. K class
11. RSH
12 BCW and BSV
13. Oil tankers
14. 30 class tank engine
15. 43 class
Subscribe to:
Posts (Atom)