Thursday, February 26, 2009

NON-SOUND CPH/CTH ON THE WATER

Word from the factory is that the production run of the non-sound CPH/CTH is finished and is booked on a ship leaving Shenzhen on the 1st of March.

Ron

Monday, February 16, 2009

38 Class Paint Samples

Last seven painted 38 class bodies have arrived and we now have received all 13 paint schemes. These are being checked and when we have confirmed the 13 liveries painting of the bodies will commence. Assembly will commence when the painting stage is finished.
Photos will be up on the web-site shortly.

,

Friday, February 13, 2009

CPH/CTH Update

Word from the factory today is that assembly of the non-sound CPH/CTHs is well advanced and should be completed late next week. We should then recieve a shipping date. No dates for the sound equipped units yet.

Monday, January 26, 2009

LCH/CCH Stock Update

At the current rate of sales it is estimated that stocks of LCH and CCH 4 wheel hoppers will last about six months. However, stocks of pack No 3 (LCHs) and pack No 4 (CCHs) are now both down to less than 20 packs. Packs 3 and 4 are back-up packs that provide different sets of numbers for those who wish to run more than 10 of either the LCHs or CCHs. It appears that we have under-estimated the demand for these packs and they will be the first to sell out completely.
Anyone intending to purchase adittional packs are advised to do so quickly if different numbered wagons are important

Saturday, January 17, 2009

38 Class Update

Whilst at the factory I saw painted body samples for all liveries of the 38 class. They looked superb. I couldn't bring them back with me so the factory has put them on Fedex and I have received advice that they will be delivered Monday.
We will check the liveries and assuming they are correct forward our approval to the factory so that when the factory resumes production after Chinese New Year painting and then assembly can commence. This would suggest a delivery date sometime in March or April.
I will put photographs on the web-site as soon as they can be arranged.

Friday, January 16, 2009

A Most Succesful Factory Visit

Arrived back in Sydney yesterday (Thursday) and just getting over the jet lag. This was a very succesful (and enjoyable) visit. I have started work on the next edition of The Eureka Times which should be ready for distribution next week.
I will also be posting snippets of information here as I think of stuff.
As a matter of interest and an indication of snippets to come the following is the agenda for the two meetings held at the factory. (The main meeting was at the Design Department followed by a second meeting in the Drawing Department for more detailed discussions on projects at the drawing stage.)
1. CPH/CTH
2. 38 class
3. 40 class
4. R class
5. 59 class
6. AD60 re-run
7. HUB car set
8. DEB set
9. 620/720 re-run
10. K class
11. RSH
12 BCW and BSV
13. Oil tankers
14. 30 class tank engine
15. 43 class

Saturday, January 10, 2009

On Special

I have two sound equipped 620/720 2 car diesel sets on which the headlights do not work. They can be in Early Tuscan, Indian Red or Reverse liveries. They are marked down $94 per set to $400 per set on a first come-first served basis.